A lot has been done this summer. The brick work is now all up (pictures later). The ridgecap is bein made and installed. The stonework has been sandblasted, cleaned out, and tucked pointed. I am working on the drainage system in the basement, what a mucky mess! Pouring the floor is next. Still a lot of good working weather ahead.
No comments:
Post a Comment